Three Gorges Dam |
| Three Gorges Dam | ||
Three Gorges Dam |
||
| Official name | 长江三峡大坝 | |
|---|---|---|
| Impounds | Yangtze River | |
| Creates | Three Gorges Reservoir | |
| Locale | Sandouping, Yichang, Hubei, China | |
| Maintained by | China Three Gorges Dam Project | |
| Length | 2,335 metres (7,661 ft) | |
| Height | 101 metres (331 ft) from river level (185 metres (607 ft) from sea level) | |
| Width (at base) | 115 metres (377.3 ft) | |
| Construction began | 1994-12-14 | |
| Construction Cost | Estimated 180 billion yuan (39 billion U.S. dollars) | |
| Reservoir information | ||
| Capacity | 39.3 cu km
(9.43 cu mi) |
|
| Catchment area | 1,000,000 km2 (386,102 sq mi) | |
| Bridge information | ||
| Carries | 598 | |
| Geographical Data | ||
| [[Image:Template:Convert/3000000/km2/sqmi/0/abbr=on} | ] | |
| Coordinates | ||
The Three Gorges Dam (simplified Chinese: 长江三峡大坝; traditional Chinese: 長江三峽大壩; pinyin: Chángjiāng Sānxiá Dà Bà) is a hydroelectric river dam that spans the Yangtze River in Sandouping, Yichang, Hubei, China. It is the largest hydro-electric power station in the world. Except the ship lift, all the original plan of the project was completed on Oct. 30, 2008, when the 26th generator was brought to commerical operation.1 Six additional generators in the underground power plant are being installed, with the dam thus not expected to become fully operational until about 2012. The total electric generating capacity of the dam will reach 22,500 MW.2
As with many dams, there is a debate over costs and benefits. Although there are economic benefits such as flood control, clean hydroelectricity and navigation, there are also concerns about the relocation of people, siltation, loss of archaeological and cultural sites and the impact on regional ecosystem.3
The dam was originally envisioned by Sun Yat-sen in The International Development of China in 1919.5 In 1932 the Nationalist government, led by Chiang Kai-shek, began preliminary work on plans for a dam in the Three Gorges. Then in 1939 the Japanese military forces occupied Yichang and surveyed the area. A design, the Otani plan, was completed for the dam in anticipation of a Japanese victory over China.6 In 1944 involvement from the United States began when the Bureau of Reclamation engineer J.L. Savage surveyed the area and drew up a dam proposal. Around 54 Chinese engineers were sent to the U.S. for training. Some exploration, survey, economic study, and design work was done, but the government, in the midst of the Chinese Civil War, halted work in 1947.7
After the 1949 communist victory, the leader Mao Zedong supported the project, but the Gezhouba Dam project was begun first and economic problems including the Great Leap Forward and the Cultural Revolution slowed progress. In 1958, after the Hundred Flowers Campaign, some engineers who spoke out against the project were imprisoned.8
During the 1980s plans were revived. Pushed through by Li Peng, the dam was approved by the National People's Congress in 1992 with a record number of abstentions and dissenting votes.citation needed The construction started on December 14, 1994.9 The dam was expected to be fully operational in 2009, but due to additional projects such as the underground power plant with 6 additional generators, and due to the complexity of the ship lift, the dam is not expected to become fully operational until about 2011.8The dam will raise the water level the third time to its designed maximum water level (175 m above sea level) by the end of 2008.10
The dam wall is made of concrete and is about 2,309 metres (7,575 ft) long, and 101 metres (331 ft) high. The wall is 115 metres (377.3 ft) thick on the bottom and 40 metres (131.2 ft) thick on top. The project used 27,200,000 cubic metres (35,600,000 cu yd) of concrete, 463,000 tonnes of steel, enough to build 63 Eiffel Towers, and moved about 102,600,000 cubic metres (1.342E+8 cu yd) of earth.11
When the water level is maximum at 175 metres (574 ft) over sea level (91 metres (299 ft) above river level), the reservoir created by the Three Gorges Dam is about 660 kilometres (410 mi) in length and 1.12 kilometres (0.70 mi) in width on average, and contains 39.3 cu km (9.43 cubic miles) of water.The total surface area of the reservoir is 1045 km². The reservoir will flood a total area of 632 km² of land compared to the 1,350 km² of reservoir created by the Itaipu Dam. The Three Gorges Dam reservoir is longer than the 560 kilometres (348 mi) length of Lake Superior, but only 1.1 % of the surface area of the lake (82,400 km²) and about 1/700 of the volume of the lake (28700 cu km).12
When finished, the project will have cost 180 billion yuan, over 20 billion yuan less than the initial estimated budget of 203.9 billion yuan, just under 30 billion USD. This is because the calculation accounts for the effect of inflation, and the lower costs are attributed to a low inflation rate in recent years.13 It is estimated that the cost of construction will be recovered when the dam generates 1000 TWh of the electricity, which will be sold at the price of 250 billion yuan. This will take 10 more years after the dam starts full operation.5
Sources for funding include the Three Gorges Dam Construction Fund, profits from the Gezhouba Dam, policy loans from the China Development Bank, loans from domestic and foreign commercial banks, corporate bonds, and revenue from Three Gorges Dam before and after it is fully operational, with additional charges for electricity contributing to the Three Gorges Construction Fund. The additional charges are as follows: Every province receiving power from the Three Gorges Dam has to pay an additional charge of ¥7.00 per MWh. Provinces that will not receive power from the Three Gorges Dam have to pay an additional charge of ¥4.00 per MWh. Tibet does not have to pay any additional money.14
The Three Gorges Dam is the world’s largest hydro-electric power station by total capacity, which will be 22,500 MW.5 It will have 34 generators in total. Thirty two of them are main generators, each with a capacity of 700 MW, and the other two are plant power generators, each with capacity of 50 MW. Fourteen are installed in the north side of the dam, twelve in the south side and the remaining six in the underground power plant in the mountain south of the dam. After completion, the expected annual electricity generation would be over 100 TWh, 18% more than originally predicted 84.7 TWh, since six more generators were added to the project in 2002.
Each of the main generators weighs about 6000 tonnes and are designed to produce at least 700 MW of power, which is enough to power a large city. The designed head of the generator is 80.6 m. The flow rate varies between 600 cu m to 950 cu m depending on the head available. The Three Gorges Dam project installs Francis Turbines. The Francis Turbine is the most efficient turbine in the world.15The diameter of the turbine is 9.709/10.427m(VGS design/Alstom's design). It rotates at a speed of 75 rpm. The normal rated power of the generator is 778 MVA. The maximum power is 840 MVA. The power factor is 0.9. The generator produces electrical power at 20 kV. The outer diameter of the generator stator is 21.42/20.9m. The inner diameter is 18.5/18.8m. The height of the stator is 3.13/2.95m. It is the biggest stator in the world. The load at the bearing is 5050/5500 tonnes. The average efficiency of the generators is over 94%, and the highest is 96.5%.16
The generators are manufactured by two joint ventures. One of them includes Alstom, ABB, Kvaerner and the Chinese company Haerbin Motor. The other includes Voith, General Electric, Siemens (abbreviated as VGS), and the Chinese company Oriental Motor. The technology transfer agreement was signed together with the contract. More than 8 of the 32 generators are made in China. Most of the generators are water-cooled. Some newer ones are air-cooled, which are simpler in design,manufacture and easier to maintain.17
The 14 generators in the north side of the dam have already been installed. The first one (No.2 ) started to power on July 10, 2003. The last one (No.9) started to power on September 7, 2005. All of the 14 generators first ran to full power (9800 MW) on October 18, 2006 after the water level had been raised to 156 m.18
The 12 generators in the south side of the dam have already been installed.The first generator (No. 22) in the south side of the dam started working on June 11, 2007. The last generator (No. 15) on the south side of the dam was completed and brought to the power grid on Oct.30, 2008.19 The sixth generator in the south side (No. 17) started working on December 18, 2007. It brought the total capacity of the dam to 14.1 GW, surpassing the generating capacity of Itaipu (14.0 GW), to become the largest hydroelectric power plant in the world. The seventh generator in the south side (No. 17) started working on December 27, 2007.The eighth generator in the south side (No. 24) started working on April 25, 2008.20 The ninth generator in the south side (No. 19) started working on June 18, 2008.21The tenth generator in the south side (No. 16) started working on July 2, 2008.22The eleventh generator in the south side (No. 23) started working on August 19, 2008.23The total capacity of the plant is currently at 18.30 GW.
Added to the project in 2002,the underground power plant and its six generators are still under construction. The Three Gorges Dam project also sets the record of having most generators being installed in one year (2007), that is 7 units with a capacity of more than 5000 MW.24 25
As of October 30, 2008 the Three Gorges Dam Project had generated over 274.4 TWh of electricity, more than one fourth of the 1000 TWh it needs to generate to cover the cost (see Economics section).26 With 18,300 MW installed capacity, the generation capacity of the Three Gorges Dam Project is about 4,300 MW more than that of the Itaipu Dam. In July 2008, the Three Gorges Dam generated 10.3 TWh of electricity, which is the first time to generate more than 10 TWh in a month.27
| Year | Number of installed units |
TWh |
|---|---|---|
| 2003 | 6 | 8.607 |
| 2004 | 11 | 39.155 |
| 2005 | 14 | 49.090 |
| 2006 | 14 | 49.250 |
| 2007 | 21 | 61.600 |
| 2008 | 26 | 66.754 |
| Total | 26(32) | 274.456 |
The electricity generated by the Three Gorges Dam project was sold to the State Grid Corporation and China Southern Power Grid at a flat rate of ¥250 per MWh ($35.7 US) until July 1st, 2008. The price of electricity now is different depending on which province is selling to, ranging from ¥230.6 per MWh to ¥311.1 per MWh 28. Nine provinces and two cities consume the power from it, including Shanghai.29
The power distribution and transmission of the Three Gorges Dam project cost about 34.387 billion Yuan. It was completed in December 2007, one year ahead of time.30
Power is sent in three directions. The 500 kV DC transmission line to the East China Grid has a capacity of 7,200 MW. There are three 500 kV DC transmission lines: HVDC Three Gorges-Shanghai(3,000 MW), HVDC Three Gorges-Changzhou(3,000 MW) and HVDC Gezhouba - Shanghai(1,200 MW). The 500 kV AC transmission line to Central China Grid has a capacity of 12,000 MW. The other 500 kV DC transmission line HVDC Three Gorges-Guangdong to South China Grid has a capacity of 3,000 MW and supplies Guangdong.31
In the original plan, it was expected to provide 10% of electricity consumption in China. However, China’s demand for electricity has increased at a higher rate than was planned, and if fully operational now, it would support about 3% of the total electricity consumption in China.32
According to The National Development and Reform Commission of China, it takes 366 grams of coal to generate 1 kWh of electricity in China(2006).33 Therefore, the Three Gorges Dam will potentially reduce the coal consumption by 31 million tonnes per year, cutting the emission of 100 million tonnes of greenhouse gas,34 millions of tonnes of dust, 1 million tonnes of sulfur dioxide, 370 thousand tonnes of nitric oxide, 10 thousand tonnes of carbon monoxide and a significant amount of mercury into the atmosphere.35 The elimination of the fossil fuel also reduces the energy consumption in mining, washing and transporting about 31 million tonnes of coal from northern China to the load centre in south and east China.
Since the dam started generating power on July 10, 2003, total power production is equivalent to 84 million tonnes of standard coal and reduces carbon dioxide emission by 190 million tonnes, sulfur dioxide by 2.29 million tonnes and nitroxides by 980,000 tonnes.36
From 2004 to 2007 there were total of 198 million tonnes of goods passed through the Three Gorges Dam ship locks. The freight capacity of the river increased 6 times and the cost of shipping reduced by 25%, compared to previous years, which reduces carbon dioxide emission by 630,000 tonnes. Comparing to highway transportation, the amount of fuel that Three Gorges Dam project saved between the year of 2004 and 2007 is equivalent to 4,100,000 tonnes of standard coal. Thus it reduces carbon dioxide emission by 10 million tonnes.36
Since the construction of the Three Gorges Dam, many waste water treatment plants have been completed to reduce the water pollution from the large populated city Chongqing and the suburban area around it. According to the ministry of environmental protection of PRC, until April 2007, there were more than 50 waste water treatment plants installed and the total capacity reached 1.84 million tonne per day. More than 65% of the waste water is treated before being dumped into the Three Gorges Dam reservoir. About 32 land sites deposit were completed and could handle 7664.5 tonne of solid waste every day. 3738
The Three Gorges Dam pushes the Chinese government to think seriously about the environmental issues associated with the dam, such as deforestation and water pollution.citation needed “The FAO’s research suggests that the Asia-Pacific region will, overall, gain about 6,000 square km of forest in 2008.That is quite a turnaround from the 13,000 square km net loss of forest each year in the 1990s. The main reason is China’s huge reforestation effort. This accelerated after terrible floods in 1998 convinced the government that it must restore tree cover, especially in the mighty Yangtze’s basin” upstream of the Three Gorges Dam.39
The most significant function of the dam is to control flooding, which is a major problem of a seasonal river like the Yangtze. Millions of people live downstream of the dam, and many large and important cities like Wuhan, Nanjing and Shanghai lie next to the river. Plenty of farm land and the most important industrial area of China are built beside the river.
The reservoir's flood storage capacity is 22 km3(18 million acre feet). This capacity will reduce the frequency of major downstream flooding from once every 10 years to once every 100 years. With the dam, it is expected that major floods can be controlled. If a "super" flood comes, the dam is expected to minimize its effect.5
In 1954 the river flooded 47.75 million acres (193,000 km²) of land, killing 33,169 people and forcing 18,884,000 people to move. The flood covered Wuhan, a city with 8 million people, for over three months, and the Jingguang Railway was out of service for more than 100 days.5 In the event of a recurrence of the 1954 flood that carried 50 billion m3 of water, the Three Gorges Dam could only divert the water above Chenglingji, leaving 30 to 40 billion m3 of flood water to be diverted.40 Also the dam will not protect the large tributaries such as the Xiangjiang, Zishui, Yuanshui, Lishui, Hanjiang, and Ganjiang from flooding,due to the location of the dam.
In 1998 a flood in the same area caused billions of dollars in damage. The Chinese government asked for support from its military to fight the flooding. Two thousand and thirty-nine square kilometers of farm land was flooded. The flood affected more than 2.3 million people, and 1,526 were killed.41
The installation of ship locks is intended to increase river shipping from 10 million to 100 million tonnes annually, with transportation costs cut by 30 to 37%. Shipping will become safer, since the gorges are notoriously dangerous to navigate.36 Each of the two ship locks is made up of 5 stages taking around 4 hours in total to complete and have a capacity of 10,000 tons.42 Critics argue, however, that heavy siltation will clog ports such as Chongqing within a few years based on the evidence from other dam projects.
The locks are designed to be 280 m long, 35 m wide, and 5 m deep (918 x 114 x 16.4 ft).4344 That is 30 m longer than those on the St Lawrence Seaway, but half as deep. Before the dam was constructed, the maximum freight capacity of the river at the Three Gorges site was 18.0 million tonnes per year. From year 2004 to 2007, there were total of 198 million tonnes of freight passed through the Three Gorges Dam ship locks. The freight capacity of the river increased 6 times and the cost of shipping reduced by 25%, comparing to the previous years. The total capacity of the ship locks is expected to reach 100 million tonnes. 36
In addition to the canal locks, the Three Gorges Dam will be equipped with a ship lift, a kind of elevator for vessels.45 The ship lift is designed to be capable of lifting ships of up to 3,000 tons.464748 In the original plan its capacity was to be 10,000 tons. The ship lift was not yet complete when the rest of the project was officially opened on May 20, 2006.4950 Construction of the ship lift started in October 2007 and is anticipated to be completed in the year 2014.51
The relocation of local residents is the central part of the Three Gorges Dam Project. It is considered as important as the construction of the dam. During the planning stages in the 1990s it was estimated that 1.13 million residents would be forced to relocate; the final number (as of June 2008) ended up with 1.24 million after the last town called Gaoyang in Hubei Province was relocated52 53 This number is about 1.5% of the total population of Hubei Province (60.3 million) and Chongqing City (31.44 million) where the reservoir is located.54 About 140,000 residents were relocated out of Hubei province to eastern provinces and some central provinces, and the majority of the remaining people were relocated within Hubei Province.55 The whole relocation project was completed on July 22, 2008.53 On October 11, 2007 Chinese state media announced that under a development plan of Chongqing city, an additional 4 million people will be encouraged to move from their homes near the dam to the Chongqing metropolitan area by the year 2020.565758
On one hand, the massive relocation demonstrates the Chinese government's determination and will to complete the huge project. On the other hand, there have been accusations that corruption in the government has kept residents from getting proper assistance. For instance, millions in tax money sent to the town of Gaoyang for the purpose of relocation for 13,000 farmers disappeared after it was sent to the local government, and residents were denied compensation.59
| It has been suggested that Environmental issues with the Three Gorges Dam be merged into this article or section. (Discuss) |
Of the 3,000 to 4,000 remaining critically endangered Siberian Crane, a large number currently spend the winter in wetlands that will be destroyed by the Three Gorges Dam. The dam also contributed to the functional extinction of the Baiji, the Yangtze river dolphin. In addition, populations of the Yangtze sturgeon are guaranteed to be "negatively affected" by the dam. There are high levels of pollution currently in the Yangtze. Over one billion tons of wastewater are released annually into the river.60 The dam will significantly decrease the river's flushing capacity and the pollution ratings will increase. For the current amount of pollution, there is an estimated cost of 2.8 billion Yuan to clean the rivercitations needed.
While logging in the area was required for constructioncitations neededwhich adds to erosion, stopping the periodic and uncontrolled flooding of the river will lessen bank erosion in the long run. The build up of silt in the reservoir will, however, reduce the amount of silt transported by the Yangtze River to the Yangtze Delta and could reduce the effectiveness of the dam for electricity generation and, perhaps more importantly, the lack of silt deposited in the peninsula could result in erosion and sinking of coastal areas.
The 600 kilometer (375 mi) long reservoir has or will flood some 1,300 archaeological sites and alter the appearance of the Three Gorges as the water level rises over one hundred meters at various locations.61 Cultural and historical relics are being moved to higher ground as they are discovered but the flooding of the Gorge will undoubtedly cover some undiscovered relics. Some other sites cannot be moved because of their location, size or design. For example the hanging coffins site high in the Shen Nong Gorge is inherently part of the sheer cliffs themselves.62
There are two hazards uniquely identified with the dam.63 One is that sedimentation projections are not agreed upon, and the other is that the dam sits on a seismic fault.
The Three Gorges area currently has 10% forestation, down from 20% in the 1950s. At current levels 80% of the land in the area is experiencing erosion causing about 40 million tons of sediment to slide into the Yangtze annually.60 The relocation of people from the reservoir area will cause further deforestation and erosion due to agricultural needs.
Excessive sedimentation can block the sluice gates which can cause dam failure under some conditions. This was a contributing cause of the Banqiao Dam failure in 1975 that precipitated the failure of 61 other dams and resulted in over 20,000 deaths. Critics believe that the Yangtze will add 530 million tons of silt into the reservoir on average per year; in time, this silt could accumulate behind the walls of the dam, clogging the turbines' entranceway. However, because China has began constructing four other megadams (see below) on the upstream of Yangtze since 2006, the sedimentation from upstream would be much less than originally predicted. But the absence of silt down stream would still have two dramatic effects:
The Benthic sediment build up is a cause of biological damage and reduction in aquatic biodiversity.65
In an annual report to the United States Congress, the Department of Defense cited that in Taiwan, “proponents of strikes against the mainland apparently hope that merely presenting credible threats to China’s urban population or high-value targets, such as the Three Gorges Dam, will deter Chinese military coercion.”66
The notion that the Military of the Republic of China would seek to destroy the Dam provoked an angry response from the mainland China media. People’s Liberation Army General Liu Yuan was quoted in the China Youth Daily saying that the People’s Republic of China would be "seriously on guard against threats from Taiwan independence terrorists".67
In order to maximize the utility of the Three Gorges Dam and cut down on sedimentation from the Jinsha, a tributary of the Yangtze river, China plans to build a series of dams upstream of the Yangtze river, including Wudongde Dam, Baihetan Dam, Xiluodu Dam, Xiangjiaba Dam, and downstream of Jinsha. The total capacity of those four dams is 38,500 MW,71 almost double the capacity of the Three Gorges.72 There are also another eight dams in the midstream of the Jinsha and eight more upstream of it.73